Downloads

Click below to access downloadable product information and installation instructions.

Documents are subject to change and new documents may be added at any point in time. Please be sure to check back for updates prior to starting a new project. Contact us if you have any questions.

Additional resources and videos can be found on our YouTube page.


Omega-Lite® Brochure

Effective Date: February 19, 2021

The Omega-Lite ACM panels and installation systems brochure has everything you need to know regarding technical data, references & testing, approvals & compliances, detailed product & system information, and so much more.

Field-Fabricated Installations Systems Brochure

Effective Date: May 1, 2019

Laminators’ back-drained and ventilated field-fabricated installation systems provide designers and installers with the optimal solution to meet the challenges associated with achieving a code-compliant exterior wall envelope.

Insulated Glazing Panels Brochure

Effective Date: August 7, 2023

In addition to our standard flat Thermolite™ panel, Laminators offers fabricated options to provide additional R-Value, new aesthetics, and the ability to create hairline joints between panels. Also featured is our new InfernoShield™ Non-Combustible Insulated Glazing Panel.

InfernoShield® Non-Combustible Insulated Glazing Panels Flyer

Effective Date: February 1, 2023

Information about our new non-combustible glazing panel.

Architectural Color Chart

Effective Date: August 15, 2023

View colors with finish options. Unlimited custom colors are also available.

Cleaning Recommendations

Effective Date: June 21, 2022

Recommendations on routine care and how to clean ACM panels.

Code-Compliance Conflicts in the Exterior Wall Assembly

Effective Date: 2016

NOTE: You can no longer receive credit for this course. This is for informational purposes only. 

CAD Details and Technical Bulletins are to be considered as part of Laminators’ System Guides and are required to install our systems properly.

Additional resources and videos can be found on our YouTube page.

Laminators Approved Materials

Effective Date: February 23, 2022

This document contains information that supplements content in our current system guides.

Laminators Approved Materials (Legacy Version)

Effective Date: Effective February 23, 2022

This document contains information that supplements content in our legacy system guides.

1-Piece, Tight-Fit Molding System Guide

Effective Date: March 18, 2022

The back-drained and ventilated 1-Piece, Tight-Fit Molding installation system offers a traditional yet high-tech appearance at an affordable cost. Aluminum moldings used to encapsulate panel edges are available in both flat and reveal styles, providing two different aesthetic options for installation.

1-Piece, Tight-Fit Molding System Guide (Legacy Version)

Effective Date: November 2014

Clip & Caulk System Guide

Effective Date: Effective October 5, 2020

The back-drained and ventilated Clip & Caulk installation system provides the traditional look of a shop-fabricated wet seal system without the added hassle and cost of panel fabrication.

Clip & Caulk System Guide (Legacy Version)

Effective Date: April 2015

Dry Seal Installation Guide

Effective Date: January 25, 2021

Create a high-performance, pressure-equalized wall system that reduces moisture-related issues in the wall cavity.

InfernoShield Edge Treatment Instructions

Effective Date: September 26, 2023

Installation videos can also be viewed on our YouTube channel @LaminatorsInc

Omega-Flex System Guide

Effective Date: March 23, 2021

Omega-Flex panels are intended for use on curved substrates with a radius ranging from 17' down to 8'. Panels are installed using Laminators' aluminum moldings.

Rout & Return Installation Guide

Effective Date: Effective October 26, 2016

Prefabricated panels can be panned on-site using standard carpentry tools to give a solid, finished appearance.

TB #1012: ANSI/UL 263 Fire-Resistance Rated Exterior Wall Assemblies

Effective Date: April 1, 2020

The purpose of this Technical Bulletin is to provide information regarding the relationship of fire-resistance ratings (ANSI/UL 263) of exterior wall assemblies to Laminators Inc. ACM panel systems, Omega CI rigid insulation panels, and NFPA 285 compliance.

TB #1011: Building Code Provisions for Omega CI® with Fire-Treated Plywood

Effective Date: August 12, 2019

The purpose of this Technical Bulletin is to provide an understanding of International Building Code (IBC) provisions for the application of Laminators Inc. Metal Composite Material (MCM) Systems with Omega CI® (OCI) Rigid Insulation Panels.

TB #1010 – ACM Applications

Effective Date: June 15, 2023

ACM panel installations continuing over the top of an exterior wall and seamlessly transitioning into a coping/roofing element has become an increasingly popular aesthetic among design professionals. This tech bulletin serves to provide design professionals an understanding of why ACM panel systems shall not be used in coping/roofing applications and presents alternative concepts to achieve a similar aesthetic.

TB #1007 – Fabrication Sealant Change

Effective Date: December 3, 2020

This tech bulletin serves to provide a definitive explanation of where fabrication sealant is to be used as it pertains to our installation systems.

TB #1005 – Testing Requirements for Insulated Panels

Effective Date: December 14, 2015

This tech bulletin serves to inform the design community of the code-required testing associated with insulated panels and the requirements for reporting R-values as a measure of thermal performance per today’s energy codes.

1-Piece, Tight-Fit Molding Technical Data Sheet (BDV)

Effective Date: February 8, 2021

1-Piece, Tight-Fit Molding Technical Data Sheet (Legacy Version)

Effective Date: January 12, 2024

Clip & Caulk™ Technical Data Sheet (BDV)

Effective Date: February 8, 2021

Clip & Caulk™ Technical Data Sheet (Legacy Version)

Effective Date: January 12, 2024

Dry Seal Technical Data Sheet

Effective Date: January 12, 2024

Rout & Return Technical Data Sheet

Effective Date: January 12, 2024

Omega-Lite® Technical Data Sheet

Effective Date: October 19, 2021

Omega CI® Technical Data Sheet

Effective Date: March 20, 2020

InfernoShield® Technical Data Sheet

Effective Date: March 5, 2024

Thermolite™ Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ U-Max Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ SE Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ WE Technical Data Sheet

Effective Date: October 19, 2021

Omega Foam-Ply® Technical Data Sheet

Effective Date: January 24, 2020

Glaze-Lite™ Technical Data Sheet

Effective Date: October 19, 2021

Omega-Flex Technical Data Sheet

Effective Date: March 15, 2021

Laminators Incorporated provides Installation/System Guides, CAD Drawings, and an Approved Materials List to be used in the development of shop drawings. Shop drawing details may be generated to meet/adapt to project-specific conditions provided such details remain in conformance with Laminators CAD Drawings. However, shop drawing details that are generated in conflict with Laminators CAD Drawings are not supported and will render any warranty null and void. Please contact Laminators Technical Support for any questions regarding the use of Laminators CAD Drawings.


Insulated Glazing Panel CAD Drawings (Thermolite Series, InfernoShield)

DESCRIPTIONEFFECTIVEDWGPDF
Insulated Glazing Panels, Thermolite Series (IGP-TL), InfernoShield (IGP-IS)November 28, 2023DWGPDF

Omega CI Rigid Insulation Panel CAD Drawings

DESCRIPTIONEFFECTIVEDWGPDF
Omega CI, Over Steel Stud Framing with Gypsum Sheathing (OCI-SF-GYP)March 30, 2020DWGPDF
Omega CI, Over CMU or Concrete (OCI-CMU)March 30, 2020DWGPDF

1-Piece, Tight-Fit Molding CAD Drawings (BDV)

DESCRIPTIONEFFECTIVEDWGPDF
1-Piece, Tight-Fit Molding, BD&V Over Omega CI (1P-BDV-OCI)March 21, 2023DWGPDF
1-Piece, Tight-Fit Molding, BD&V Over Gypsum Sheathing (1P-BDV-GYP)March 21, 2023DWGPDF
1-Piece, Tight-Fit Molding, BD&V Over CMU or Concrete (1P-BDV-CMU)March 21, 2023DWGPDF

1-Piece, Tight-Fit Molding CAD Drawings (Legacy Version)

DESCRIPTIONEFFECTIVEDWGPDF
1-Piece, Tight-Fit Molding, Legacy, Over Plywood SheathingJanuary 31, 2020DWGPDF
1-Piece, Tight-Fit Molding, Legacy, Over Non-Structural SheathingJanuary 31, 2020DWGPDF
1-Piece, Tight-Fit Molding, Legacy, NFPA 285 CompliantJanuary 31, 2020DWGPDF

Clip & Caulk CAD Drawings (BDV)

DESCRIPTIONEFFECTIVEDWGPDF
Clip & Caulk, BD&V Over Omega CI (CC-BDV-OCI)March 21, 2023DWGPDF
Clip & Caulk, BD&V Over Gypsum Sheathing (CC-BDV-GYP)March 21, 2023DWGPDF
Clip & Caulk, BD&V Over CMU or Concrete (CC-BDV-CMU)March 21, 2023DWGPDF

Clip & Caulk CAD Drawings (Legacy Version)

DESCRIPTIONEFFECTIVEDWGPDF
Clip & Caulk, Legacy, Over Plywood SheathingJanuary 31, 2020DWGPDF
Clip & Caulk, Legacy, Over Non-Structural SheathingJanuary 31, 2020DWGPDF
Clip & Caulk, Legacy, NFPA 285 CompliantJanuary 31, 2020DWGPDF

Dry Seal CAD Drawings

DESCRIPTIONEFFECTIVEDWGPDF
Dry Seal, Over Plywood or OSB (Structural) Sheathing (DS-PLY)December 3, 2020DWGPDF
Dry Seal, Over Gypsum (Non-Structural) Sheathing (DS-GYP)June 9, 2022DWGPDF
Dry Seal, Over Omega CI (DS-OCI)December 3, 2020DWGPDF
Dry Seal, Over Alternate CI System (with Vertical Rails) (DS-ACI-V)December 3, 2020DWGPDF
Dry Seal, Over Alternate CI System (with Horizontal Rails) (DS-ACI-H)January 19, 2021DWGPDF

Rout & Return CAD Drawings

DESCRIPTIONEFFECTIVEDWGPDF
Rout & Return, Over Plywood or OSB (Structural) Sheathing (RR-PLY)December 3, 2020DWGPDF
Rout & Return, Over Gypsum (Non-Structural) Sheathing (RR-GYP)December 3, 2020DWGPDF
Rout & Return, Over Omega CI (RR-OCI)December 3, 2020DWGPDF
Rout & Return, Over Alternate CI System (with Vertical Rails) (RR-ACI-V)December 3, 2020DWGPDF
Rout & Return, Over Alternate CI System (with Horizontal Rails) (RR-ACI-H)January 19, 2021DWGPDF

Omega-Flex CAD Drawings

DESCRIPTIONEFFECTIVEDWGPDF
Omega-Flex, Over Plywood or OSB (Structural) Sheathing (OF-PLY)March 15, 2021DWGPDF

We provide comprehensive technical shop drawings for ACM cladding projects. This includes engineering design criteria that is job specific and is tailored to the individual job conditions. Our team of project managers use the latest software available to create detail-oriented drawings from the information shown in the construction documents. Our shop drawings contain precise and accurate elevations with dimensions, sections and details to explain the installation and fabrication of the panels.  

To ensure we have everything we need to provide you with accurate shop drawings, we have compiled some helpful resources. Documents are subject to change and new documents may be added at any point in time. Please be sure to check back for updates prior to starting a new project.

Shop Drawings Criteria Checklist

Effective Date: October 14, 2021

CAD Drawings Reference Matrix

Effective Date: February 2, 2021

TIP:  When in the Word document, to view non-printing Editor’s Notes that provide guidance for editing, click on the “Show/Hide ¶” button in the tool panel at the top.

Field-Fabricated Panel Systems Specification (1-Piece, Tight-Fit and Clip & Caulk – Legacy Version)

Effective Date: April 29, 2022

Field-Fabricated Panel Systems Specification (1-Piece, Tight-Fit and Clip & Caulk – BDV)

Effective Date: April 29, 2022

Continuous Insulation Specification (Omega CI)

Effective Date: April 29, 2022

Shop-Fabricated Panel Systems Specification (Dry Seal and Rout & Return)

Effective Date: April 29, 2022

Glazing Specification w/ Insulated Glazing Panels (Thermolite, Omega Foam-Ply, InfernoShield, Glaze-Lite)

Effective Date: February 6, 2024

ESL-1248 (NFPA 285 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for the following systems: 1-Piece, Tight-Fit Molding with BDV and Clip & Caulk with BDV over both Omega CI and gypsum sheathing.

ESL-1249 (AAMA 509 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for the following installation systems: 1-Piece, Tight-Fit Molding with BDV over Omega CI and Clip & Caulk with BDV over both Omega CI and gypsum sheathing.

ESL-1250 (ASTM E330 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for the following installation systems: 1-Piece, Tight-Fit Molding with BDV over Omega CI and Clip & Caulk with BDV over both Omega CI and gypsum sheathing.

ESL-1251 (ASTM D1781 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for Omega-Lite ACM panels.

ESL-1252 (ASTM E331 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for the following installation systems: 1-Piece, Tight-Fit Molding with BDV and Clip & Caulk  with BDV over Omega CI.

ESL-1253 (ASTM E84 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for Omega-Lite ACM panels.

ESL-1254 (ASTM E283 Standard)

Effective Date: March 9, 2023

Laminators Incorporated maintains an ICC-ES Listing Report for the following installation systems: 1-Piece, Tight-Fit Molding with BDV and Clip & Caulk with BDV over Omega CI.

NFPA 285 with 1-Piece, Tight-Fit Molding System Over Omega CI®

Effective Date: August 1, 2019

Laminators Incorporated has met the conditions of acceptance of NFPA 285 for its 1-Piece, Tight-Fit Molding installation system with back-drained and ventilated subframing over Omega CI®.

NFPA 285 with 1-Piece, Tight-Fit Molding System Over Gypsum Sheathing

Effective Date: August 1, 2019

Laminators Incorporated has met the conditions of acceptance of NFPA 285 for its 1-Piece, Tight-Fit Molding installation system with back-drained and ventilated subframing over gypsum sheathing.

NFPA 285 with Clip & Caulk System Over Omega CI®

Effective Date: August 14, 2019

Laminators Incorporated has met the conditions of acceptance of NFPA 285 for its Clip & Caulk installation system with back-drained and ventilated subframing over Omega CI®.

NFPA 285 with Clip & Caulk System Over Gypsum Sheathing

Effective Date: August 1, 2019

Laminators Incorporated has met the conditions of acceptance of NFPA 285 for its Clip & Caulk installation system with back-drained and ventilated subframing over gypsum sheathing.

Miami-Dade NOA – Expires 08/2025

Effective Date: November 9, 2023

Laminators Incorporated has received a Notice of Acceptance (NOA) from Miami-Dade County Product Control Section for Omega-Lite ACM panels installed with a variety of the company’s installation systems under NOA #23-0911.07, expiring on August 20, 2025. Each applicable installation system met the requirements of the small and large missile impact testing using Laminators Omega-Lite ACM panel over a plywood substrate, and are approved for use in all HVHZs with a design wind pressure of +/- 120 pounds per square foot.

Florida Product Approval (FL17652-R3)

Effective Date: November 2023

Laminators’ Omega-Lite® ACM panels and applicable installation systems are approved for use in all Florida jurisdictions requiring FPA, including the High Velocity Hurricane Zone (HVHZ) with a wind load design pressure of +/- 120 pounds per square foot. The approval, FL# 17652-R3, includes 6mm Omega-Lite ACM panels installed in four of Laminators’ proprietary installation systems—1-Piece, Tight-Fit Molding, Clip and Caulk, Dry Seal, and Rout & Return.

Omega-Lite® Health Product Declaration

Effective Date: January 19, 2022

Glaze-Lite™ Health Product Declaration

Effective Date: January 19, 2022

Thermolite™ Health Product Declaration

Effective Date: February 2, 2022

Recycled Content Information for Architectural Composite Panels

Effective Date: May 30, 2023

Warranty Request Form

Effective Date: March 31, 2020

Credit Application

Effective Date: June 7, 2023

Takeoff Request Form

Effective Date: October 10, 2020

Sign Panel Products Brochure

Effective Date: January 26, 2024

A handy showcase of our sign panel products.

Sign Panel Products Comparison Chart

Effective Date: January 26, 2024

Easily view and compare products, construction, applications, colors, sizes and more.

Sign Panel Products Recommended Applications

Effective Date: March 25, 2022

Recommended applications for our sign panel products.

Sign Panel Production Guide

Effective Date: November 31, 2023

Application and installation guidelines for sign panel products.

Top 5 Reasons to Use Alumalite® vs Solid Core ACM

Effective Date: March 2022

Read why Alumalite is better than a solid core ACM.

Recycled Content Information for Sign Composite Panels

Effective Date: May 30, 2023

Alumalite® Standard Technical Data Sheet

Effective Date: March 3, 2022

Alumalite® Economy Technical Data Sheet

Effective Date: March 3, 2022

Alumalite® Ultra Technical Data Sheet

Effective Date: March 3, 2022

Omega-Bond® Standard Technical Data Sheet

Effective Date: March 23, 2023

Omega-Bond® Economy Technical Data Sheet

Effective Date: September 21, 2021

Omega-Bond® Premium Technical Data Sheet

Effective Date: March 23, 2032

LusterBoard™ Technical Data Sheet

Effective Date: April 19, 2021

Omega SignBoard™ Technical Data Sheet

Effective Date: April 19, 2021

Credit Application

Effective Date: June 7, 2023

Composite Panels Brochure

Effective Date: May 13, 2022

Information on our customizable composite panels and how they may be a fit for your OEM application.

Alumalite® Standard Technical Data Sheet

Effective Date: March 3, 2022

Alumalite® Economy Technical Data Sheet

Effective Date: March 3, 2022

Alumalite® Ultra Technical Data Sheet

Effective Date: March 3, 2022

Omega-Bond® Standard Technical Data Sheet

Effective Date: March 23, 2023

Omega-Bond® Economy Technical Data Sheet

Effective Date: September 21, 2021

Omega-Bond® Premium Technical Data Sheet

Effective Date: March 23, 2032

LusterBoard™ Technical Data Sheet

Effective Date: April 19, 2021

Omega SignBoard™ Technical Data Sheet

Effective Date: April 19, 2021

InfernoShield® Technical Data Sheet

Effective Date: March 5, 2024

Glaze-Lite™ Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ SE Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ U-Max Technical Data Sheet

Effective Date: October 19, 2021

Thermolite™ WE Technical Data Sheet

Effective Date: October 19, 2021

Credit Application

Effective Date: June 7, 2023